Step 1a: Deploy Outriggers

Step 1 2 3 4 5 6 7 8 9 10 11
Next

Step 1b: Pre-Level Trailer

Due South

Drop trailer with tongue pointing DUE South...

Move truck away from front of trailer...

Pull the outrigger lock pins and loosen the set-bolt...

Slide outrigger out either to hard stop or until lock-pin holes align...

Pull the jack locking pins and rotate jack downward until the spring lock engages...

Replace lock pins or tighten set-bolts ...

Starting with the aft end, use either a bubble level or small stright level to level the tower mount laterally (side-to-side)...

 

If using a round bubble level for this aft adjustment, it only needs to be centered from side-to-side...

Deploy all four outriggers at least a foot ...

Moving to the forward outriggers, refer to the bubble level mounted on the front rail to adjust the forward jacks until the bubble is centered...