

The Prospector™ Mule
Portable Solar/Weather Station


Step 1a: Deploy Outriggers
Step 1b: Pre-Level Trailer
Drop trailer with tongue pointing DUE South...
Move truck away from front of trailer...
Pull the outrigger lock pins and loosen the set-bolt...
Slide outrigger out either to hard stop or until lock-pin holes align...
Starting with the aft end, use either a bubble level or small stright level to level the tower mount laterally (side-to-side)...
If using a round bubble level for this aft adjustment, it only needs to be centered from side-to-side...
Moving to the forward outriggers, refer to the bubble level mounted on the front rail to adjust the forward jacks until the bubble is centered...